Showing posts with label Ideas. Show all posts
Showing posts with label Ideas. Show all posts

Sunday, 3 February 2013

Best 15 Projects List With Description For IT Students !

Co / It Projects
Best 15 Projects List For Computer & IT Group ! This Projects List Is With The Description Of Every Projects For Getting The Idea Of The Projects ! These Projects Are Based On The Platform Of  Java.
These Projects Are Simple To Understand & Easy To Implement ! So Download The List & Enjoy The Implementation !
Download The Projects List From Here & Give Comment's :-
    

Publisher: Vaibhav Deshmukh - Sunday, February 03, 2013

Sunday, 27 January 2013

Mechanical Engineering Projects List !

Mechnical Engineering Projects
For Those Mechanical Engineering Students Who Do !Here Is The Mechanical Engineering Projects List ! We Give The Best 25 Projects Ideas In This PDF Document ! These Ideas Are Mostly Related To The Working World ! So This Is The Best Experience For Mechanical Engineer's To Do The Things That Directly Related To The Working World !
We Give The Best 25 Projects Topics In The PDF Document !So Do The Project By Own & Get Scope To Your Future Opportunities !
  Download The Mechanical Engineering Projects List From Here :-


Publisher: Vaibhav Deshmukh - Sunday, January 27, 2013

Wednesday, 23 January 2013

Automatic Main Supply Failure Soulution Project Idea For E&Tc !

Project ideas
Now Days Because Of  The Load-shading & Other Reasons Power Cuts Are Increased & Mains Supply Fails At Any Time Without Any Info ! It Causes The Lot Of Trouble ! The Solution Is Here For Domestic Users & also Industrial Sectors ! The Project Does    

1. It senses the main supply failure and give starting pulse to diesel generator through start solenoid.
2. If the generator dose not get started with the first attempt ,it will make two more attempts to start the D.G.set. When it fails to start with three attempts, it will sound an alarm with indication “ START FAIL”
3. Even if the engine starts normally but alternator dose not produce the required voltage, in that case “ALTERNATOR FAIL” signal will come
4. After the gen set has started normally and it has come to normal voltage ,it will switch on its breaker automatically (auto-on-load)
5. During normally running condition, if any fault occurs on the engine side, it will stop automatically with the respective fault and buzzer indication.
6. when the main supply get re-stored, it will change over to mains and switch off the D.G. set automatically.
7. It can be operated on both auto or manual mode.
Download The Project Idea From Below 
Publisher: Vaibhav Deshmukh - Wednesday, January 23, 2013